• Joe@lemmy.world
    link
    fedilink
    English
    arrow-up
    1
    arrow-down
    1
    ·
    17 days ago

    I wonder how many sites where they can find that power readily available throughout Europe. European networks were never designed for that type of draw.

    It seems like they will need to provide big battery stations to do that rate of charging.

    • Leeks@lemmy.world
      link
      fedilink
      arrow-up
      4
      ·
      17 days ago

      Each Flash charger carries 370kWh of on-site battery storage, split across two 185kWh units, allowing a site to draw as little as 100kW or as much as 560kW from the local grid