Shares in data centre operator NEXTDC fell 42 per cent in a single day after the company revealed that delays in getting power to a proposed expansion of its massive complex in inner-west Melbourne meant its future earnings would be cut by a third.

A neighbourhood dispute and an act of civil disobedience, residents parking their cars in the street to deny trucks access, had stopped the march of industrial-scale power poles that would provide the juice for the next stage of the data centre.

  • notgold@aussie.zone
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 month ago

    I’m not 100% with M3 (Footscray complaint one) but I’ve seen the M2 (Tullamarine) ones fire up regularly enough. M1 (Fishermen’s Bend) fires up fairly regularly though I don’t know the exact clocking.

    I feel for the Tullamarine residents more than Footscray though. Sharps Rd Tullamarine will have 3 huge data centres; NextDC and Vantage bordering houses and then Air trunk ~800m up the road. Imagine when all 3 generator test coincide.