My experience 😑

High cost work with little to no accountability.

You can count on them doubling the estimate every single time, and you have to keep on them just to make sure the work gets done.

Just had one set of subcontractors throw away material for other fixes… Lead group days that the ones involved are no longer a part of the project, so we’re on the hook for even more.

Thinking back, i have always been unhappy with the work done by a contractor. I’m not asking for much, painters paint an area, plumbers stop leaks, drywall dudes fix the water damage… And the job is always left with areas unpainted, pipes not connected, and holes in the drywall that were not there before.

Have you ever been happy with a contractors work? What did they do for you?

  • TheOSINTguy@sh.itjust.works
    link
    fedilink
    arrow-up
    6
    ·
    19 hours ago

    I’m assuming the hospital didn’t let her out for accessibility reasons, other then showing them the wheel chair, did they ask for pictures or videos of the accessibility modifications or did they come to your house and inspect it?

    Also fuck cancer. Must have been tough having to do all of this and getting that diagnosis.

    • jordanlund@lemmy.world
      link
      fedilink
      arrow-up
      4
      ·
      15 hours ago

      Photos and seeing the chair in person were enough. There were no actual inspections until we got her home.

      And yeah, dealing with all that + cancer sucked. At one point we were both actually in the same hospital at the same time. I went in for my surgery on 2/19 and was in until 2/23. She was in 1/26 to 3/5.