Holy shit. Bloomberg just verified one of my biggest scoops - that Microsoft only has 2gw of operational capacity. I had it at 1.993GW in prep for the story that [@aishadown.bsky.social](https://bsky.app/profile/did:plc:pazzytppogqe26vbcux5u2dx) and I did for the guardian. Vindication!
[www.theguardian.com/technology/2...](https://www.theguardian.com/technology/2026/aug/17/are-microsofts-ai-plans-being-held-back-by-a-shortage-of-chips)
That is another problem, everyone rushed to buy all the AI hardware and then didn’t realize that some parts (like getting connected to the power grid) might be a huge bottleneck in the system
Imagine being that stupid that you don’t account for…electricity. The indomitable captains of crapital everyone.
Hey, that is not my job. My job is to buy the GPUs and the RAM and the SSDs, making use of all that is another guy’s problem.
That is why the new frontier is not backup diesel or LNG power, but fully or partially off-grid datacenters. I’ve seen that some are even buying less efficient jet turbines for power generation because there is such a huge backlog.
They’re going to recreate XB-0 Hresvelger from Ace Combat as a mobile data center hidden in the mountains of Eastern Europe. It’s destroyed by the Allied Forces before it can take flight as their planned and permanent aerial data-ship connected by satellite and fueled by atmospheric FBOs (floating base operator).
This is why I wouldn’t even hire a finance bro to watch my dog. He’d under-feed it, over walk it, and by time I got back he’d tell me how he just managed to saved me a bunch of money.
Imagine being that stupid that you don’t account for…electricity. The indomitable captains of crapital everyone.
Hey, that is not my job. My job is to buy the GPUs and the RAM and the SSDs, making use of all that is another guy’s problem.
That is why the new frontier is not backup diesel or LNG power, but fully or partially off-grid datacenters. I’ve seen that some are even buying less efficient jet turbines for power generation because there is such a huge backlog.
https://www.techspot.com/news/110732-jet-engines-diesel-generators-step-data-centers-outpace.html
Ah sales.
Sell Anything. Let Engineering Suffer.
They’re going to recreate XB-0 Hresvelger from Ace Combat as a mobile data center hidden in the mountains of Eastern Europe. It’s destroyed by the Allied Forces before it can take flight as their planned and permanent aerial data-ship connected by satellite and fueled by atmospheric FBOs (floating base operator).
This is why I wouldn’t even hire a finance bro to watch my dog. He’d under-feed it, over walk it, and by time I got back he’d tell me how he just managed to saved me a bunch of money.