This is actually very reasonable, rail enabled, bigger than what we currently have, but not the absolute monsters that were planned.
I wonder if the ability to operate fully under electrical power for part of the crossing has been retained?
This is actually very reasonable, rail enabled, bigger than what we currently have, but not the absolute monsters that were planned.
I wonder if the ability to operate fully under electrical power for part of the crossing has been retained?
Does that include $1B in cancellation costs? (number from near end of article)
It will be interesting to see when they announce the cost. I’m not sure they even know, it doesn’t seem like they have asked for quotes yet. Just browsed for ferries on trade me.
We currently have one ferry that can take 27 rail cars. Are the new ones intended to replace the old ones or work alongside them? I’m assuming replace them. So I hope both of the new ferries can take rail, as every time someone drives Aratere into something the rail capacity vanishes:
It’s not explicitly said in the article, but the ships will be sister ships, from my understanding, and will be replacing the entire fleet.
Also, the original vessels were $550 mil for the pair, no way is the cancellation cost more than that.
Hmm the $1B number came from Labour. They are probably referring to a total cost of the project, which would not all be wasted as that investigative work would form the basis of the new plan.
Interesting how the project was ballooning to possibly $4B. That’s some massive cost to build new terminals. I’d support spending it if they build the southern one near Blenheim instead of Picton, for cutting the journey time.
Yeah, it had ballooned to more than double their initial estimate, quite frankly, I don’t trust Labour’s numbers on any of this.