MILAN (AP) — There is no backup stadium if the main ice hockey arena for the Milan Cortina Winter Games is not ready on time.

Construction on the arena that is set to welcome NHL players back to the Olympics for the first time in more than a decade is behind schedule and its completion is going right down to the wire.

A test event at the Santagiulia Ice Hockey Arena — the new, 16,000-seat venue on the outskirts of Milan — had to be moved, and new test events aren’t scheduled until Jan. 9-11.

  • oppy1984@lemdro.id
    link
    fedilink
    English
    arrow-up
    5
    ·
    16 hours ago

    I thought for a long time that there should be 4 sites for the Olympics, two for summer and two for winter. The Olympic committee maintains them with help from the host county and donations or dues from the participants counties.

    Pick 4 suitable sites in as stable countries as you can find, and build world class facilities there. This whole building all new facilities every time is fucking stupid and wasteful. Besides it’s been shown that the “revenue generated” doesn’t make up for the costs to build, run, and clean up after all of it.