So I have rebuilt my Production rack with very little in terms of an actual software plan.

I host mostly docker contained services (Forgejo, Ghost Blog, OpenWebUI, Outline) and I was previously hosting each one in their own Ubuntu Server VM on Proxmox thus defeating the purpose.

So I was going to run a VM on each of these Thinkcentres that worked as a Kubernetes Cluster and then ran everything on that. But that also feels silly since these PCs are already Clustered through Proxmox 9.

I was thinking about using LXC but part of the point of the Kubernetes cluster was to learn a new skill that might be useful in my career and I don’t know how this will work with Cloudflared Tunnels which is my preferred means of exposing services to the internet.

I’m willing to take a class or follow a whole bunch of “how-to” videos, but I’m a little frazzled on my options. Any suggestions are welcome.

  • mesa@piefed.social
    link
    fedilink
    English
    arrow-up
    42
    ·
    11 hours ago

    Just gotta say that looks like a really nice setup. Mine looks like a small rats nest!

    • njordomir@lemmy.world
      link
      fedilink
      English
      arrow-up
      10
      ·
      10 hours ago

      The cables seem to increase exponentially don’t they? First, you have a few computers and a half dozen cables powering things and linking everything together, then you add a couple servers, maybe a second nic on your NAS, and another switch or two since things are now further from the router. Suddenly your office looks like a giant bowl of spaghetti covered in prop 65 stickers.

    • nagaram@startrek.websiteOP
      link
      fedilink
      English
      arrow-up
      4
      ·
      9 hours ago

      The rats nest is behind it

      I need to re do some of the wiring.

      I have all 4 power cables braided and zip tied together with the single data cable so its nice to pull out and put back into the entertainment center.

      Only problem is I only had four 1 foot Ethernet cables and three 7 foot cables. So I used the 1 footers for the Pis and the 7 footers are bundled up as best I could and neatly hidden.

      I’m waiting on some color coordinated .5 foot cables from Cables and Kits and I will swap the switch and patch panel. I want the Pis to have that one cable and that’s it, but I also want all the patch panel ports to work.